Paşaköy Composite Steel Villa Project

This 200 m² villa is an example of a composite structural system: the main load-bearing system is designed in heavy steel, and all other elements in light-gauge steel. Built on a sloping site, its steel frame was completed in just 10 days.
Features
- Heavy steel main load-bearing system
- All other elements in light-gauge steel
- 200 m² floor area
- Steel frame completed in 10 days
- Location: Paşaköy
- Year: 2022
