Pelit Bonded Warehouse – Derince

Completed in 2015 in Derince, Kocaeli, Pelit Bonded Warehouse was built entirely with light steel members, with two bays giving a total span of 52 m and a length of 100 m. Wide lattice roof trusses, loading docks and daylight strips make it a storage building suited to intensive logistics use.
Features
- Two bays, total span 52 m
- 100 m building length
- Entirely light steel members
- Loading docks and sectional doors
- Manufactured to TSE standards
